Express stations can be paired to deliver up to 125 kW to a vehicle, enabling high-power charging with limited infrastructure costs.
Save space with the smallest fast charging footprint, whether standalone or paired.
Always keep vehicles charged and ready using built-in redundancy.
By leveraging the pairing capability of Express, efficiency is maximized by sharing power modules and power allocation.